Demolishing a typical house on a standard Brisbane block costs $15,000 to $55,000 in published figures, about $25,000 typical. A single-storey timber or fibro house with no significant asbestos is usually $15,000 to $22,000, and a double-storey house $25,000 to $50,000. Tell us about the property and one licensed, insured local demolition contractor will inspect it and give you an itemised price.

Updated November 2026

House Demolition prices

  • Typical house, standard block$15,000–$55,000 (about $25,000)
  • Single-storey timber or fibro (no significant asbestos)$15,000–$22,000
  • Single-storey brick veneer$18,000–$30,000

Published price ranges, not a quote. Your price is confirmed in writing before any work starts.

Get my free quote

House Demolition in Brisbane

Example photo: Excavator demolishing a house
Example photo: Excavator demolishing a house
Example photo: Run-down house before demolition
Example photo: Run-down house before demolition

Example demolition photos, not jobs by the contractor you are matched with. Ask the contractor for photos of their own recent work.

Signs it is time for house demolition

  • You're doing a knock down rebuild or building a duplex
  • The house has major termite, rot or structural damage
  • Renovating would cost close to the price of a new build
  • You're subdividing or clearing the block to sell
  • A fire, flood or storm has left the house unsafe

What does a house demolition include?

An asbestos check and removal first, then disconnection of power, gas, water and sewer, capping of the drains by a licensed plumber, site fencing, the knock-down itself, sorting and carting of the waste, and a level, clean block at the end. A good quote lists each of these as its own line.

Ask what happens to the slab, the driveway, trees and fences. Some quotes include them and some don't, which is the most common reason two prices look so different.

Knock down rebuild: when does the demolition happen?

On a knock down rebuild, demolition comes after your builder's plans and approvals are well advanced, because the house can't come down until building approval for the demolition is in place. Most owners book the demolition contractor once the builder gives a likely start date, so the block isn't left empty for months.

Your builder may have a demolition contractor they prefer. A separate quote is still worth having, because demolition is often priced with a margin when it is bundled into a build contract.

Do I need approval to demolish a house in Brisbane?

Yes, demolition needs building approval, which is arranged through a licensed private building certifier. Separately, Brisbane City Council planning approval can be needed for a house built in or before 1946, particularly in the Traditional building character overlay, and those applications are not always approved. Check the council's guidance before you sign anything if your house is a pre-war Queenslander or worker's cottage.

Licences and safety

In Queensland, removing more than 10 m² of bonded asbestos needs a WorkSafe Class B licence, and friable asbestos needs a Class A licence. Demolition using an excavator, skid steer or other load-shifting equipment needs a demolition work licence. Building approval for a demolition comes from a private building certifier, and Brisbane homes built in or before 1946 can also need council planning approval.

How much does house demolition cost in Brisbane?

JobPublished price range
Typical house, standard block$15,000–$55,000 (about $25,000)
Single-storey timber or fibro (no significant asbestos)$15,000–$22,000
Single-storey brick veneer$18,000–$30,000
Double-storey house$25,000–$50,000
Bonded asbestos removed inside the quote$1,500–$10,000
Disconnecting services$1,000–$3,000

Published price ranges from whatsthedamage.com.au (updated Nov 2026), not our quote. Council and certifier fees are extra. Size, construction, asbestos, access for machines and trucks, and what stays or goes (slab, driveway, trees) decide your price. Source: whatsthedamage.com.au, Brisbane demolition costs (updated Nov 2026). See every job in the Brisbane demolition and asbestos cost guide.

The standard we ask of every contractor we refer you to

The contractor does the work, not us. Ask for each of these in your written quote and contract.

  • The right WorkSafe Queensland licence for the job: Class A or B for asbestos, and a demolition work licence where machinery or other licensed demolition is involved
  • Public liability insurance, with the certificate on request
  • Asbestos identified (tested where unsure) and removed before the building comes down
  • A written, itemised quote: demolition, asbestos, disconnections, disposal and site clean-up listed separately
  • Building approval arranged through a private certifier before demolition starts
  • Services disconnected and drains capped by licensed trades
  • Asbestos waste wrapped, labelled and taken to a licensed facility, with the disposal receipt
  • A level, clean site at handover

Asbestos dealt with first, and paperwork you keep

Any asbestos is removed by a licensed removalist before demolition. Ask for the asbestos removal paperwork, the clearance certificate where one applies, and the tip receipts.

Licensed, insured contractor, public liability certificate on request

Our standard

Demolition done properly, by licensed contractors

Cutting corners on demolition, especially on asbestos, puts your family, your neighbours and your budget at risk. That's why every job we pass on goes to a licensed, insured Brisbane contractor who agrees to this standard before they get the work.

Licensed for the job

In Queensland, asbestos removal over 10 m² needs a WorkSafe Class B licence (Class A for friable asbestos), and demolition with an excavator or other load-shifting machinery needs a demolition work licence. Jobs only go to contractors who hold the right licences.

Asbestos first

Most Queensland homes built before 1990 have some fibro. Suspect material is tested, and any asbestos is removed by a licensed removalist before machines start.

Approvals sorted

Building approval for a demolition comes from a private building certifier. In Brisbane, homes built in or before 1946 can also need council planning approval.

An itemised price first

Demolition, asbestos, disconnections, disposal and clean-up as separate lines, so quotes compare fairly and there are no surprises.

Neighbours and safety

Site fencing, dust control, and notice to neighbours before work starts. Asbestos work areas are signed and controlled.

Legal disposal

Asbestos goes only to licensed facilities, and concrete, brick and steel are recycled where possible. Ask for the tip receipts.

A clean, level site

The block is left level and clear, ready for the builder, the pool area or the new slab.

House Demolition questions

Published figures put a typical house on a standard block at $15,000 to $55,000, about $25,000 typical. A single-storey timber or fibro house with no significant asbestos is usually $15,000 to $22,000, and a double-storey house $25,000 to $50,000.