Strip-Outs and Partial Demolition in Brisbane
A bathroom strip-out in Brisbane costs about $1,500 to $4,500 and a kitchen strip-out $2,500 to $6,000 in published figures, while a whole-house strip-out to the frame runs $8,000 to $20,000. Removing a non-structural internal wall is $800 to $2,500. One licensed, insured local contractor will check for asbestos and quote.
Updated November 2026
Strip-Outs & Partial Demolition prices
- Bathroom strip-out$1,500–$4,500 (about $2,000)
- Kitchen strip-out$2,500–$6,000 (about $3,000)
- Whole-house strip-out to the frame$8,000–$20,000
Published price ranges, not a quote. Your price is confirmed in writing before any work starts.
Get my free quoteStrip-Outs & Partial Demolition in Brisbane


Example demolition photos, not jobs by the contractor you are matched with. Ask the contractor for photos of their own recent work.
Signs it is time for strip-outs & partial demolition
- You're renovating and want the old kitchen or bathroom gone
- You want to open up the living areas
- A lease is ending and the tenancy must be returned to shell
- Flood or fire damage needs stripping back to the frame
Get the asbestos checked before anything comes out
Wet-area wall sheeting, vinyl floor tiles and their backing, and some old wall and ceiling linings in pre-1990 homes can contain asbestos. A strip-out is exactly when it gets broken, so have suspect materials tested first. If asbestos is found, it is removed by a licensed removalist as part of, or before, the strip-out.
Structural walls and Queenslanders
Before any wall comes out, find out whether it is load-bearing. Removing a structural wall needs an engineer's design and usually building approval. In Queenslanders, many internal walls are single-skin VJ boards that are part of the bracing, so get advice before removing them. In Brisbane, homes built in or before 1946 have their own council rules for demolition work, though removing an internal wall is often listed as minor work that doesn't need planning approval.
Units, townhouses and shops
In units and townhouses, check the body corporate's rules on working hours, lift protection and waste before booking. Commercial strip-outs (shops, offices and tenancies at the end of a lease) are a common job too; mention the make-good requirements in your lease on the quote form.
How much does strip-outs & partial demolition cost in Brisbane?
| Job | Published price range |
|---|---|
| Bathroom strip-out | $1,500–$4,500 (about $2,000) |
| Kitchen strip-out | $2,500–$6,000 (about $3,000) |
| Whole-house strip-out to the frame | $8,000–$20,000 |
| Non-structural wall removal (per wall) | $800–$2,500 |
| Wet-area asbestos removal (one room) | $1,500–$4,500 |
Published price ranges from whatsthedamage.com.au (updated Nov 2026), not our quote. Asbestos, access, floor level, waste volume and whether anything structural is involved decide your price. Source: whatsthedamage.com.au, Brisbane demolition costs (updated Nov 2026). See every job in the Brisbane demolition and asbestos cost guide.
The standard we ask of every contractor we refer you to
The contractor does the work, not us. Ask for each of these in your written quote and contract.
- The right WorkSafe Queensland licence for the job: Class A or B for asbestos, and a demolition work licence where machinery or other licensed demolition is involved
- Public liability insurance, with the certificate on request
- Asbestos identified (tested where unsure) and removed before the building comes down
- A written, itemised quote: demolition, asbestos, disconnections, disposal and site clean-up listed separately
- Building approval arranged through a private certifier before demolition starts
- Services disconnected and drains capped by licensed trades
- Asbestos waste wrapped, labelled and taken to a licensed facility, with the disposal receipt
- A level, clean site at handover
Asbestos dealt with first, and paperwork you keep
Any asbestos is removed by a licensed removalist before demolition. Ask for the asbestos removal paperwork, the clearance certificate where one applies, and the tip receipts.
Licensed, insured contractor, public liability certificate on request
Demolition done properly, by licensed contractors
Cutting corners on demolition, especially on asbestos, puts your family, your neighbours and your budget at risk. That's why every job we pass on goes to a licensed, insured Brisbane contractor who agrees to this standard before they get the work.
Licensed for the job
In Queensland, asbestos removal over 10 m² needs a WorkSafe Class B licence (Class A for friable asbestos), and demolition with an excavator or other load-shifting machinery needs a demolition work licence. Jobs only go to contractors who hold the right licences.
Asbestos first
Most Queensland homes built before 1990 have some fibro. Suspect material is tested, and any asbestos is removed by a licensed removalist before machines start.
Approvals sorted
Building approval for a demolition comes from a private building certifier. In Brisbane, homes built in or before 1946 can also need council planning approval.
An itemised price first
Demolition, asbestos, disconnections, disposal and clean-up as separate lines, so quotes compare fairly and there are no surprises.
Neighbours and safety
Site fencing, dust control, and notice to neighbours before work starts. Asbestos work areas are signed and controlled.
Legal disposal
Asbestos goes only to licensed facilities, and concrete, brick and steel are recycled where possible. Ask for the tip receipts.
A clean, level site
The block is left level and clear, ready for the builder, the pool area or the new slab.