Knock Down Rebuild in Brisbane: Demolition Steps, Costs and Timing

Demolition Brisbane·Updated November 2026·7 min read

For a knock down rebuild in Brisbane, demolishing a typical house on a standard block costs $15,000 to $55,000 in published figures, about $25,000 typical, plus asbestos removal, disconnections and approval fees. The demolition itself takes days; the lead time is in approvals and asbestos, so line it up with your builder's start date.

Example photo: excavator demolishing a house
Example photo: excavator demolishing a house

What does the demolition part cost?

Published figures for Brisbane:

  • Single-storey timber or fibro house, no significant asbestos: from $15,000.
  • Single-storey brick veneer house, no asbestos: from $18,000.
  • Double-storey house: from $25,000.
  • Bonded asbestos removed inside the demolition quote: from $1,500.
  • Disconnecting power, gas, water and sewer: from $1,000.

The ranges run up to $22,000, $30,000, $50,000, $10,000 and $3,000 respectively. Council and certifier fees are extra.

What should a demolition quote include?

Ask for each of these as its own line:

  • Asbestos inspection and removal
  • Disconnection of services and drain capping by a licensed plumber
  • Site fencing and dust control
  • The knock-down and disposal, with recycling where possible
  • Slab, driveway, fences, trees and pool, if they are going
  • A level, clean block at the end

Two quotes that look far apart usually differ in what they include, not in the price of the same work.

When should the demolition happen?

Not too early. Once the house is down, the block sits empty until your builder starts. Most owners book the demolition when the builder has building approval in sight and a likely start date. Remember the demolition needs its own building approval through a private certifier, and a pre-1947 house may need Brisbane City Council planning approval as well.

Should the builder or you book the demolition?

Either works. Many builders include demolition in their contract, often through a contractor they use regularly. Getting your own quote for comparison is worthwhile, because demolition bundled into a build contract can carry a margin. If you book it yourself, make sure the contractor and builder agree on the finished site level and who removes the slab.

Can anything be saved?

In older Brisbane homes, hardwood floors, VJ walls, doors, windows and fretwork can have resale value, and some houses are removed whole and relocated rather than demolished. Ask the contractor whether salvage is reflected in the price.

What you get for the price

The standard we ask of every contractor we refer you to

The contractor does the work, not us. Ask for each of these in your written quote and contract.

  • The right WorkSafe Queensland licence for the job: Class A or B for asbestos, and a demolition work licence where machinery or other licensed demolition is involved
  • Public liability insurance, with the certificate on request
  • Asbestos identified (tested where unsure) and removed before the building comes down
  • A written, itemised quote: demolition, asbestos, disconnections, disposal and site clean-up listed separately
  • Building approval arranged through a private certifier before demolition starts
  • Services disconnected and drains capped by licensed trades
  • Asbestos waste wrapped, labelled and taken to a licensed facility, with the disposal receipt
  • A level, clean site at handover

Asbestos dealt with first, and paperwork you keep

Any asbestos is removed by a licensed removalist before demolition. Ask for the asbestos removal paperwork, the clearance certificate where one applies, and the tip receipts.

Licensed, insured contractor, public liability certificate on request

Questions people ask

The knock-down and clean-up usually take days. Approvals, asbestos removal and service disconnections can take several weeks, so start early.

Published 20 November 2026.